Italian Navy says Giovanni delle Bande Nere intercepted ballistic target with Aster 30 Block 1NT missiles

By Martin Chomsky (Defence Industry Europe)

Air and missile defence |
Italian Navy says Giovanni delle Bande Nere intercepted ballistic target with Aster 30 Block 1NT missiles

Photo: Italian Navy.

The Italian Navy says ITS Giovanni delle Bande Nere (P 434) successfully detected, tracked and intercepted a high-speed ballistic target during a complex firing exercise. The engagement took place on 10 November, with the service announcing the result on 20 November.

The PPA-class multirole warship used two MBDA Aster 30 Block 1NT missiles against a STAR 160 target in the final event of an Italian naval exercise. In a subsequent social media statement, the navy said the ship had neutralised the target after completing the onboard detection, tracking and engagement sequence.

The navy described a sequence beginning with detection and precision tracking, followed by calculation of a firing solution through the ship’s combat management system. The engagement then culminated in what the service characterised as a successful interception.

The result demonstrated an interception capability beyond the ship’s earlier activity during Formidable Shield 2025. During that exercise, Giovanni delle Bande Nere used its Kronos radar to track a short-range ballistic target until it fell into the sea, without attempting to intercept it.

The Italian Navy said the latest firing placed it among a small group of navies capable of countering ballistic threats directly from the sea. It presented the result as a milestone for Italian maritime defence and the national technology industry, linking the capability to the security of maritime routes in the Mediterranean and beyond.

Official sources did not disclose the location of the November firing. Comparative analysis of radar imagery placed it at Souda Bay in north-western Crete, where the NATO Missile Firing Installation, or NAMFI, is located.

Giovanni delle Bande Nere is the fourth vessel in the seven-ship PPA programme and the first completed in the most extensively equipped configuration, known as PPA Full. This version is intended for frontline operations in a full-scale conflict.

The ship’s keel was laid on 28 August 2019, followed by its launch on 12 February 2022. It began sea trials in August 2022 and formally entered Italian naval service on 2 October 2024.

The ballistic-target firing took place three days before Giovanni delle Bande Nere returned to its home port of Taranto on 13 November. Its return concluded its first extended operational deployment, lasting 197 days.

During the deployment, the ship participated in the multinational RIMPAC 2026 and Pacific Dragon exercises in the Pacific Ocean. The November engagement added a successful interception to its previously demonstrated ballistic-target tracking capability.